Structural Assessment Specification, Issue 1
What an assessment of an existing building from us establishes, in what order, against which standards, and what we need from you at enquiry. Published so that a client, a funder or a checking engineer can see the method before the report arrives, and hold us to it afterwards.
What does a Lead Group structural assessment establish?
Nine things, in order: what is there, the existing load, the proposed change, the governing load case, the margin against the current Eurocodes, the effect of condition, the assumptions and limitations, a conclusion in two separate statements (meets current code demand; safe in current use), and what follows if the margin is short. Each is assessed against the standard named for it, and the report is checked and signed before issue.
- Nine items, always in the same order
- Standards named by part, year, amendment and National Annex
- Two conclusions, never merged
- Checked and signed before issue
Purpose and scope
This specification sets out what a structural assessment of an existing building prepared by Lead Group establishes, and the order in which it is done. It applies to roof loading appraisals where plant, oversheeting, a walkway or a new use is proposed; to change of use appraisals; to condition assessments of frames, floors, walls and roofs; and to the structural part of a pre-purchase or due diligence report. It does not cover the design of new structures, which follows the relevant Eurocode directly, or RAAC, which has its own procedure.
It is published for three readers. The client, so the scope is agreed before the fee is. The checking engineer, who signs the report and needs to see that each item was addressed. And anyone relying on the report later, a funder, an insurer, a building control body or another engineer, who needs to know what was established and on what basis. A downloadable copy is at Structural Assessment Specification, Issue 1 (PDF).
What the assessment establishes
1. What is there. The structural form, the materials, the member sizes, the connections, the bearings and the restraint, established by survey and measurement on site, from any drawings that exist, and by opening up where the structure cannot otherwise be seen. Drawings are evidence of intent, not of what was built; where they are relied upon the report says so. Areas not seen are recorded as not seen, and the coverage of the survey is stated as a proportion of the structure, not implied.
2. The existing load. Self-weight from what is actually there, including finishes, services and anything added since construction, with densities to BS EN 1991-1-1 Annex A or by measurement. Imposed loads for the present use from the UK National Annex to BS EN 1991-1-1, including the Category H roof loads of Table NA.7 where a roof is accessed only for maintenance. Snow to BS EN 1991-1-3 with the UK National Annex, including drift cases to Annex B where a roof abuts a taller structure, a parapet or an obstruction. Wind to BS EN 1991-1-4:2005+A1:2010 with the UK National Annex, with the roof pressure coefficients from Tables NA.5 to NA.8.
3. The proposed change. The added or altered load, stated as the client has defined it and as we have interpreted it, including point loads at fixings, dynamic effects where plant is involved, the altered wind behaviour of a changed roof covering, and the imposed load of any new access. Where the proposal is not yet fixed, the assessment states the envelope it has been checked against, so a later change can be tested against it rather than starting again.
4. The governing case. Load combinations to BS EN 1990 and its UK National Annex, with drift treated as an accidental action and the design working life stated. The report identifies which combination governs each element and why, because that is the information a client needs to decide what to change if the margin is short.
5. The margin. The utilisation of each critical element against the current Eurocode, with the resistance basis stated. Where the structure was designed to an earlier code, the report records that code and, where it is useful, the margin the original designer would have found, as a separate statement. The two are never merged.
6. Condition and its effect. Corrosion, section loss, deflection, cracking, decay, water ingress and previous alteration, recorded where found and carried into the capacity assessment as a reduction where they affect it. A sound structure under a failing covering and a failing structure under a sound covering are both reported as what they are.
7. Assumptions and limitations. Every assumption that affects the result, stated in one place: material strengths assumed, restraint assumed, areas not surveyed, information taken from others. The limitations are the boundary of what the report can be relied on for.
8. The conclusion, in two statements. First, whether the structure meets the demand of the current code for the proposed use, element by element. Second, whether it is safe in its current use. These are different findings and the report keeps them apart: a structure that does not meet current code demand is not thereby unsafe, and a structure that is safe today may still not take the proposed change.
9. What follows. Where the margin is short, the options: reduce or relocate the load, strengthen specific members, change the fixing or mounting approach, or monitor. Where strengthening is needed we quote its design separately. Where nothing is needed, the report says so in writing, because that statement is usually what the client needed.
How findings are stated
Every figure carries its unit and its source. Every standard is cited with its part, year, amendment and National Annex. Calculations are issued as readable working, not as software printouts, so that a checker or a building control officer can follow the reasoning. Photographs are referenced to a plan. The report is checked and signed before issue, and the checker's role is stated in it.
Fees are fixed and agreed before work starts, with the scope, the deliverables and a realistic timescale confirmed in the fee proposal. The output is a report, with calculations and such drawings as the job needs; where design follows, it is issued as a full design and drawing package.
What we need at enquiry
The address and a description of the building and its present use. Any drawings, previous reports or calculations, however old. Photographs of the structure if the ceiling or roof space can be seen, and of the roof covering. The proposed change, as precisely as it is known: what is being added, where, and how heavy. Who owns the building and who is instructing us, and whether anyone else will rely on the report. Access arrangements and any constraints on opening up. The date by which the finding is needed.
From that we confirm the scope against this specification, say what we can establish remotely and what needs a visit, and issue a fixed fee. Enquiries go to the contact page or contact@leadgroup.uk.
Standards referenced
BS EN 1990 and its UK National Annex (combinations, partial factors, design working life). BS EN 1991-1-1 and its UK National Annex (densities, self-weight, imposed loads). BS EN 1991-1-3 and its UK National Annex (snow, including Annex B drifts). BS EN 1991-1-4:2005+A1:2010 and its UK National Annex, with PD 6688-1-4:2009 (wind). BRE Digest 489 (2014) for roof-mounted equipment. The material Eurocodes BS EN 1992, 1993, 1995 and 1996 with their UK National Annexes, as the structure requires. Withdrawn British Standards (BS 6399, BS 5950, BS 8110, BS 5628, BS 5268) only to record the basis of an original design. Each is described on the Eurocodes hub.
Issue record. Issue 1, November 2026. This specification is reviewed when a standard it cites is amended or withdrawn, and the issue number changes when its content does. The page shows the issue in force; earlier issues are available on request.
Documents cited
- BS EN 1990:2002 and NA to BS EN 1990:2002.
- BS EN 1991-1-1:2002 and its UK National Annex, including Table NA.7.
- BS EN 1991-1-3:2003 and its UK National Annex, including Annex B and clauses NA.2.5, NA.2.21 and NA.2.22.
- BS EN 1991-1-4:2005+A1:2010, NA to BS EN 1991-1-4:2005+A1:2010 and PD 6688-1-4:2009.
- BRE Digest 489 (2014).
- BS EN 1992-1-1, BS EN 1993-1-1, BS EN 1995-1-1 and BS EN 1996-1-1 with their UK National Annexes.
Common questions
Is the assessment carried out remotely or on site?
Both, depending on what has to be established. Item 1 usually needs a visit, because what is there has to be seen and measured; the loading and capacity work is done at the desk. Where good drawings, photographs and measurements exist, some assessments are completed remotely and the report says what was relied on.
What does the report say if the roof cannot take the proposed load?
Which elements are short, by how much, under which governing case, and the options: reduce or relocate the load, strengthen specific members, change the fixing approach, or monitor. Strengthening design is quoted separately.
Can a funder or insurer rely on the report?
The report states its assumptions, its limitations and who it was prepared for. Reliance by a third party is agreed in writing before issue, and the professional indemnity schedule is available when an appointment or a funder requires it.
Why keep "meets current code" and "safe" separate?
Because they answer different questions. Many sound buildings do not meet today's code demand for a new use and are entirely safe in their present one. Merging the two statements misleads the reader in one direction or the other, and the decision the client has to make depends on which is true.