RAAC Inspection & Remediation by Lead Group
Home / Services / RAAC Inspection & Remediation

RAAC Inspection & Remediation

Reinforced autoclaved aerated concrete can fail with very little warning, and identifying it is only the first step. We survey, categorise, monitor, prop and design the remediation, from first inspection through to removal.

How we work

How do you know whether a building actually contains RAAC?

By examining the planks directly rather than inferring from construction date. RAAC is regularly confused with ordinary precast units, and the distinction matters because the failure mechanism is completely different. Identification means access above the ceiling, inspection of the plank, its bearing length and its reinforcement condition. Where access is restricted, we say what we could and could not see rather than implying whole-building coverage.

  • Designs checked and signed by a Chartered Structural Engineer
  • Risk categorised by area, not a single building-wide verdict
  • £5m professional indemnity cover
  • Propping and removal temporary works designed in-house
RAAC Inspection & Remediation

What we cover.

RAAC was used widely in UK public and commercial buildings from the 1950s to the mid 1990s, most often as roof planks. It behaves differently from ordinary reinforced concrete: the reinforcement bond is weaker, the material is porous, and deterioration is frequently hidden above a ceiling. Managing it is a structural engineering problem, not an inspection exercise.

In detail

What raac inspection & remediation actually involves.

Identification first

The first question is whether you actually have RAAC. It is routinely confused with ordinary precast concrete and with other lightweight systems, and a survey that misidentifies it either creates alarm where there is none or misses a genuine risk. Identification means getting above the ceiling and examining the plank itself, its bearing and its reinforcement, not inferring from the building's age.

Grading, not yes or no

Where RAAC is confirmed, the useful output is a risk categorisation rather than a yes or no. Planks vary across a single roof: bearing lengths differ, some have been penetrated by later services, and water ingress concentrates deterioration in specific bays. A survey that grades each area lets an estate be managed on evidence and a programme built by priority, rather than closing a building because one plank looked poor.

Remediation options

Remediation is rarely a single answer. Depending on condition, span and bearing, it can mean propping and monitoring, installing a secondary support system beneath the planks, strengthening the bearings, or full removal and replacement. Removal is the most involved, because taking a structural roof element out means the temporary works have to carry everything above and around it in the meantime.

Where we have done this

Our engineers have led RAAC inspection, survey, reporting and remediation across fire stations, industrial premises and community buildings, including designing the temporary works for panel removal on an occupied site.

How Lead Group helps

We identify whether the material is actually RAAC, grade what is there plank by plank rather than issuing a single verdict for a whole roof, and set out the remediation options with what each one costs in time and disruption. Where propping is the immediate answer, the report says what it buys and what has to follow it.

Telling RAAC from other lightweight systems

Reinforced autoclaved aerated concrete is an aerated, cementitious material cast into planks and cured under steam pressure, with a mesh or bar reinforcement that relies on a protective coating rather than on the alkalinity of the surrounding material. It contains no coarse aggregate, is far lighter than normal concrete and has an open, bubbly texture under the surface finish. In a roof it is most often found as flat planks spanning between steel or concrete supports above a suspended ceiling, which is why it goes unnoticed until someone looks.

It is confused with several things that look similar from below: dense precast concrete planks, hollow core units, woodwool slabs, and proprietary lightweight decks. Age narrows the search, because most RAAC in the UK dates from the 1950s to the mid 1990s, but age does not answer the question either way, and record drawings describe what was specified rather than what was supplied. Identification therefore means physical access to the soffit, inspection of the plank profile, its ends and its bearings, and where there is doubt a small core or a drilling to confirm the material. We say in the report which planks were seen, which were inferred and which were not accessible.

Grading on bearing, deflection and reinforcement, not on age

RAAC planks fail at their supports and at their mid span in ways that ordinary concrete does not, and the warning signs are specific. The length of bearing on the support, which is frequently less than the original design assumed; deflection and ponding, which load the plank further and admit water; transverse cracking near the supports and at mid span; evidence of water ingress, which corrodes the reinforcement behind a coating that cannot be inspected; and cut ends, notches and later service penetrations, which remove the anchorage the reinforcement depends on.

The grading we give each area is built from those observations, plank by plank where access allows, and the report states the basis of each grade so an estates team can see why one bay is graded differently from the next. A building is not given a single verdict; areas are, because that is how an estate is managed and how a programme is prioritised. We apply the grading framework current in UK practice and name it in the report, with its edition.

What propping buys, and what has to follow it

Propping is a holding measure. It removes the immediate risk from a plank or a bay that cannot be relied on, and it buys time: time to keep a building in use while the remediation is designed, procured and programmed. It does not restore the plank, it does not stop water getting in, and it does not remove the need for a decision. A report that recommends propping therefore also states what the propping buys in time, what has to be monitored while it is in place, and what has to follow it.

What follows is one of a small number of routes: a secondary support system installed beneath the planks so they no longer span alone; strengthening or extension of the bearings; or removal and replacement, which is the most involved because a structural roof element is being taken out of an occupied or partly occupied building and the temporary works have to carry everything around it in the meantime. We design the temporary works for propping and removal in-house, so the holding measure and its end point are designed by the same people.

Not sure what you need?Send us your drawings, or just a photograph of the wall. We will tell you what is required and what it costs before you commit to anything.
Standards & codes

The codes behind raac inspection & remediation.

Eurocodes 0-9 & UK National Annexes

BS EN 1990 through BS EN 1999 govern the basis of design, actions, and the design of concrete, steel, timber, masonry and aluminium structures. Every calculation we issue references the relevant Eurocode part and its UK National Annex, and states which parts were applied. Parts explained: BS EN 1990, 1991-1-1, 1991-1-3, 1991-1-4, 1992-1-1, 1993-1-1 and 1996-1-1; wind is never to the withdrawn BS 6399-2.

Analysis, design & drafting software

Structural analysis and design in Tekla Tedds and Tekla Structural Designer, with Autodesk Robot, CSC Fastrak, CSC Portal Frame, MasterSeries and Hilti Profis used where a scheme suits them. Drawing production in AutoCAD, and modelling in Autodesk Revit where a project is delivered in BIM. Output is issued as readable calculations rather than raw software printouts, so a checker or a building control officer can follow the reasoning.

Approved Document A (Structure)

The Building Regulations requirement your local authority Building Control checks against. Our calculations and drawings are prepared to demonstrate compliance so your submission is accepted without back-and-forth. For existing buildings, our published Structural Assessment Specification sets out what an appraisal establishes and in what order.

Professional indemnity insured

Every report and calculation package is backed by professional indemnity cover, which is what lets a lender, Building Control or another engineer rely on it.

Scope of an inspection. Inspections are carried out within the scope and limitations set out in the fee proposal and stated in the report. Unless expressly agreed otherwise, an inspection covers what is reasonably accessible at the time and is not a warranty that every defect, deterioration or concealed condition has been identified. Where something cannot be seen, we say so and set out what would establish it.

Process

From enquiry to sign-off.

1

Enquiry

Send drawings or describe the problem. We confirm the scope, the deliverables and a target timescale.

2

Information

We agree the survey, drawings or data we need and any site access required.

3

Engineering

Design, calculation or assessment to the relevant Eurocodes and UK National Annex.

4

Issue

A clear, defensible report or set of calculations, with assumptions and limitations stated.

Selected work

Real structures, surveyed and engineered.

All work →
Charlton Athletic FC, The Valley
Sport and recreationCharlton Athletic FC, The ValleyTwo steel monopitch stand roofs rising to 27 metres were assessed for a proposed solar PV installation. Both were cleared to carry the arrays as they stand, and the fragile roofs were surveyed entirely by drone with nobody working at height.
Read →
Questions

Common questions

Which buildings are most likely to contain RAAC?

Public and commercial buildings constructed between roughly the 1950s and the mid 1990s, most commonly in roof construction. Schools, hospitals, fire stations, community buildings and industrial premises are the usual candidates, but the only reliable answer comes from inspection.

Does finding RAAC mean the building has to close?

Not usually. Condition varies across a roof, and a graded assessment often shows that most areas are serviceable while specific bays need propping or replacement. A blanket closure is sometimes necessary but it should follow evidence rather than precede it.

Can you design the temporary works for removal?

Yes. Removing a structural roof element means everything above and around it has to be carried in the interim, and that propping is a designed system rather than a site decision. We design it alongside the removal sequence.

Can you assess a whole estate rather than one building?

Yes, and reporting in a consistent format across an estate is what allows buildings to be compared and a programme prioritised properly.

What happens if access above the ceiling is limited?

We report what we were able to inspect and what we were not, and we recommend where further access is needed. We do not extrapolate a whole-roof verdict from a handful of accessible bays.

Start a project

Tell us what you are building.

£5m PI insuredEurocode basedChecked and signed

Send the drawings or describe the project. We confirm scope, deliverables and a realistic timescale.

Start a project