Underpinning design
Underpinning extends a foundation down to firmer ground or spreads its load, and the right scheme depends on why the existing foundation failed. We design underpinning matched to the cause and the ground, across the UK.
Do I definitely need underpinning?
Often not. If subsidence was caused by a tree or a leaking drain, removing the cause and letting the ground recover, confirmed by monitoring, is usually enough. Underpinning is for genuinely inadequate foundations or progressive movement, or where a new load exceeds the existing foundation.
When underpinning is the right answer
Underpinning is a serious, disruptive and costly intervention, so the first part of the design is confirming it is actually needed. Where subsidence has been caused by a leaking drain or a nearby tree, removing the cause and allowing the ground to recover is usually enough, and monitoring proves it. Underpinning belongs to the cases where the foundation is genuinely inadequate or the ground is progressively moving and will not recover, or where a new load, such as an extra storey or a basement, exceeds what the existing foundation can carry.
We reach that conclusion from the investigation, not from a sales pitch. Trial pits show the existing foundation and the ground under it, soil testing shows its condition, and monitoring shows whether movement is still active. Only when the evidence justifies it do we move to design, and we say so plainly when a cheaper remedy will do, because unnecessary underpinning can create differential stiffness that causes new cracking of its own.
Choosing and designing the scheme
There are several underpinning methods and the choice is driven by the ground, the depth of firm strata, access, and the load. Traditional mass concrete underpinning, taking the foundation down in short, sequenced bays, suits shallow firm ground and localised movement. Beam and base underpinning spreads load onto pads or a ground beam where continuous excavation is impractical. Piled underpinning, with a beam picking up the wall and transferring load to piles, is used where firm ground is deep, where clay heave is a risk, or where excavation next to the wall would be unsafe.
The design covers the new foundation capacity to the Eurocodes, the bay sequence and dig depths, the reinforcement and the dry-pack detail where the new work meets the underside of the existing wall, and the interface with drains and services. Crucially it covers temporary stability, because underpinning removes support from part of a loadbearing wall while a bay is open. We set out the hit-and-miss sequence and any needling or propping so the building stays safe throughout.
Buildability, safety and coordination
Underpinning is as much a construction method problem as a foundation calculation, so we design it to be built safely. The sequencing that keeps the wall supported, the working space each bay needs, the treatment of nearby foundations and party walls, and the ground movement the works themselves cause all go into the design and the method statement. Where the works fall near a boundary, the party wall process and the neighbour's foundation are part of the assessment.
We coordinate with the contractor, building control and, on insurance claims, the loss adjuster, so the scheme is agreed before digging starts and the details answer site questions rather than raise them. This design work is delivered across the UK, and for European projects we prepare the calculations, sequence and details and coordinate the design with local ground data and a site visit where the foundation must be seen.
What we check.
The points our calculations resolve for a project like this.
- Confirming underpinning is justified before designing it
- Method choice: mass concrete, beam and base, or piled, driven by the ground
- New foundation capacity and depth to firm strata, checked to the Eurocodes
- Bay sequence, dig depths and dry-pack detail at the existing wall
- Temporary stability, needling and propping while bays are open
- Effect on drains, services, party walls and neighbouring foundations
From enquiry to sign-off.
Enquiry
Send drawings or describe the problem. We confirm the scope, the deliverables and a target timescale.
Information
We agree the survey, drawings or data we need and any site access required.
Engineering
Design, calculation or assessment to the relevant Eurocodes and UK National Annex.
Issue
A clear, defensible report or set of calculations, with assumptions and limitations stated.
Common questions
Do I definitely need underpinning?
Often not. If subsidence was caused by a tree or a leaking drain, removing the cause and letting the ground recover, confirmed by monitoring, is usually enough. Underpinning is for genuinely inadequate foundations or progressive movement, or where a new load exceeds the existing foundation.
What types of underpinning are there?
The main ones are mass concrete underpinning in sequenced bays for shallow firm ground, beam and base where continuous digging is impractical, and piled underpinning where firm ground is deep or clay heave is a risk. We match the method to the ground and the load.
Is underpinning safe to carry out under an occupied house?
Yes, when it is designed and sequenced properly. The key is temporary stability: we specify a hit-and-miss bay sequence and any propping or needling so only a small length of wall is unsupported at once and the building stays safe throughout.
What does underpinning design cost?
Underpinning design starts depending on the method, the extent and the ground investigation involved. We confirm the fee once the investigation shows what scheme the building actually needs.
Can you coordinate with my insurer and contractor?
Yes. On insurance claims we work with the loss adjuster, and we coordinate the scheme with the contractor and building control so the sequence and details are agreed before any digging starts.