The purpose of the submission
Building Control needs to be satisfied that the structure is adequate. That means seeing the loads that were assumed, the members chosen to carry them, the checks performed and the standards applied. A number on its own is not evidence, which is why calculations are submitted rather than conclusions.
What a complete package contains
Design loads and where they came from. The structural members selected, with the analysis behind them. Bearing and padstone details where a beam lands on masonry. A drawing showing the arrangement. A specification covering materials and workmanship. References to the standards used, which in the UK means the Eurocodes and the relevant National Annex.
Why packages get queried
Usually because something is missing rather than wrong. A beam sized without the padstone checked. A new opening designed without considering what happens to lateral stability. Foundations left unaddressed when a column now concentrates load where a wall previously spread it. Officers ask about these because they are the common failure points.
Approved inspectors and local authority
Both routes need the same engineering. The difference is administrative rather than technical, and a package written to be read by a building control officer works for either.
The practical point
Getting the calculations before work starts costs a fraction of stopping mid-build to produce them. Work that has already been done and cannot be evidenced sometimes has to be opened up again.