The brief

What the project needed.

A commercial unit being reconfigured, requiring the existing structure to be recorded accurately before the proposed layout could be designed and coordinated.

Work carried out

  • Existing floor plan survey drawings
  • Proposed floor plan design
  • External elevation drawings
  • Internal elevation sets across two sheets
  • 3D model of the proposed scheme
  • Coordinated draft pack for review
The engineering

What cupp, blackburn actually involves.

Fit-out work in an existing commercial unit lives or dies on the accuracy of the existing-condition drawings. What is recorded as a partition is sometimes carrying load, and what is assumed to be structural sometimes is not. The existing floor plans were produced first and the proposed layout designed against them.

Internal elevations were issued across two sheets because a fit-out is defined as much by its vertical surfaces as its plan. That level of internal detail is what allows a contractor to price accurately rather than allow for uncertainty.

A 3D model was produced alongside the drawn set, which is worth doing where a client needs to understand a scheme before committing to it.

Project record

CUPP, Blackburn

31 site photographs, 19 CAD files and 54 drawings and documents.

Not sure what you need?Send us your drawings, or just a photograph of the wall. We will tell you what is required and what it costs before you commit to anything.
Start a project

Tell us what you are building.

£5m PI insuredEurocode basedChecked and signed

Send the drawings or describe the project. We confirm scope, deliverables and a realistic timescale.

Start a project